top of page
Profile
Join date: Mar 14, 2025
POSTS (38)
Sep 9, 2026 ∙ 8 min
Fire Ratings for Flat Roof Systems: BROOF(t4) and Reaction to Fire Explained
BROOF(t4) is the highest classification for external fire performance of a roof under I.S. EN 13501-5, awarded after testing to CEN/TS 1187 Test 4, the method used in Ireland and the UK. It certifies that a complete build-up resisted penetration for 60 minutes under burning brands, wind and radiant heat. It is not a product property. It attaches to the specific assembly that was tested, so changing the membrane, the insulation, or its thickness can invalidate the classification. BROOF(t4) is...
79
0
Sep 8, 2026 ∙ 9 min
Warm Roof vs Cold Roof Construction: What Irish Specifiers Should Decide First
A warm roof places insulation above the structural deck, so the deck remains close to the internal temperature, reducing thermal bridging and lowering the risk of interstitial condensation. A cold roof places insulation below that deck and depends on a continuously ventilated void above it. For most new Irish flat roofing, the above-deck arrangement is the lower-risk starting point. Below-deck construction is generally considered only where build-up height is severely restricted, and a...
200
0
Sep 4, 2026 ∙ 6 min
Vapour Control Layers Explained: When You Need One
A vapour control layer is normally required on the warm side of insulation wherever warm, moisture-laden indoor air could reach a cold surface and condense inside the construction. It may be omitted only where the complete build-up, the airtightness strategy and a condensation risk calculation together demonstrate that it is unnecessary. Standards checked during preparation: BS 5250:2021, BS EN 13984, BS 6229:2025, I.S. EN ISO 13788, EN 1931. Project-specific condensation analysis may still...
113
0
Brian
Editor
Admin
Technical Manager
More actions
bottom of page